EVOLT delivers infrastructure that fits your site: Level 2 for dwell-time locations, Level 3 DC fast charging up to 360kW for high-throughput sites, and Battery Energy Storage Solutions (BESS) for grid-constrained deployments.
Three infrastructure tracks designed for commercial performance: driver satisfaction, site economics, and grid readiness.
Heavy Duty Vehicle Charging (e.g., buses, trucks) will be added later.
Level 2 is the workhorse of EV charging for properties where drivers park for longer durations. EVOLT deploys smart AC charging up to 19.2kW, designed for predictable charging windows.
Level 2 charging is designed for predictable dwell time: workplaces, multifamily, hotels, mixed-use, and municipal parking. EVOLT engineers the electrical backbone for expansion and uses smart load sharing to maximize ports within available capacity. Typical charging windows are 2–5 hours depending on vehicle and available power.
Expands amenity value for tenants, employees, and customers without requiring DC power levels.
Optimizes electrical capacity with dynamic load sharing and site-level scheduling.
Supports access control, reporting, and network monitoring for predictable operations.
DC fast charging is built for throughput: short dwell, high turnover, and strong driver expectations. EVOLT deploys Level 3 ultra-fast solutions up to 360kW. Under ideal conditions, that power class can add roughly ~70kWh in about ~15 minutes, depending on vehicle acceptance and battery conditions.
EVOLT designs DC fast sites as complete systems: utility strategy, switchgear, power cabinets, dispensers, networking, signage, lighting, and long-term serviceability. Power and dispenser count scale to match demand.
Increases property visibility and draws high-intent visitors during charging dwell time.
Supports fleet top-ups and time-sensitive charging with higher power availability.
Enables scalable buildouts with modular power cabinets and multi-dispenser layouts.
Battery Energy Storage Systems (BESS) help EV charging sites deploy faster and operate smarter. EVOLT integrates storage to manage demand, reduce grid stress, and support resilient commercial energy performance.
BESS stores electricity on-site and delivers it when your facility or chargers need it most. This improves project feasibility for grid-constrained deployments (common in dense metro areas like NYC and LA), supports staged buildouts, and smooths power draw for better economics.
Reduces utility demand charges by shaving peaks and smoothing charger load profiles.
Unlocks faster charger deployment when utility upgrades have long lead times.
Improves resilience with backup power strategies for critical operations.
Grid-constrained deployments: use storage to reduce required utility upgrade size and accelerate go-live.
Utility demand reduction: reduce peak demand exposure and smooth load to match rate structures.
Commercial resilience: support critical site loads and operational continuity during outages where appropriate.
Future-proofing: stage DC fast expansion with storage as a bridge until grid upgrades are complete.
EVOLT will recommend the ideal mix of Level 2, DC fast charging, and energy strategy based on dwell time, throughput, and utility constraints.